Operation was completed at Ulsteinvik Yard after vessel completed her 10-year class at the yard; Gasum also delivered LBG to sister vessel ‘Island Crusader’ in April.
Next UN Cop 27 climate conference in Egypt is unlikely to speed up IMO decisions on reducing greenhouse gas emissions in the shipping industry.
Methane slip from marine engines needs to be virtually eliminated and methane leaks upstream need to be greatly reduced for renewable LNG to contribute in achieving...
‘M/T Starway’ completed LNG bunkering operations in Malaysia after delivery, marking the 50th time in two years that EPS has bunkered LNG across its fleet.
Highlights include improving the global availability of future marine fuels through the development of renewable energy bunkering infrastructure and price considerations.
ECO Offshore uses Hydrotreated Vegetable Oil (HVO), a safe, sustainable biofuel that replaces conventional fossil fuels; customers can add ECO Offshore to their contracts.
New office cements firm’s continued growth strategy and opens its presence across Asia, offering closer connection with city state’s decarbonisation initiatives.
Bunker Holding sets target to engage in at least 10 projects by end of 2023 to set up bunkering infrastructure needed to supply low-and zero emission...
Gas and Heat demonstrated IMO Type C cargo/fuel tanks made of austenitic steel with a special grade can transport both LNG and ammonia for sea-going and...
System is designed to offer a space saving solution for smaller LNG-fuelled vessels that have limited room onboard; supports decarbonisation goals of maritime industry.