Per Funch-Nielsen joins OCM as Sales Director to promote AuctionConnect, and other related projects.
Reducing speed or power is ‘just one step on the road’ towards decarbonisation, says Philippe Louis-Dreyfus.
To initially focus on testing and trials of existing proven technologies on ships under their command, they state.
To use LNG, scrubbers, and as the main solution, compliant fuels with 0.50% or 0.10% sulphur for compliance.
The subsidiary of trading firm Vitol supplied 100 mt of 0.5pc fuel oil to a tanker in Istanbul on 4 October.
Monjasa will have VLSFO and MGO 0.1% available in Colombia, where ops include two vessels and shore tanks.
0.50% sulphur fuels now available at Amsterdam, Rotterdam and Antwerp (ARA) as well as Singapore.
2010-built Florida has a capacity of 1,825 cubic metres and will be used as a supply vessel in Zeebrugge.
Number of LNG bunkering vessels to increase as more LNG-fuelled vessels start operations, says Kasi Group CEO.
First project of JV will be to design and build a 10,000 bpd fuel oil processing facility in the U.S. Gulf Coast.