Skip to content

Singapore: MPA issues call for proposal to develop electric harbour craft charging points

  • Published
  • by Admin
Locations of the charging points will be at Jurong Port, Marina South Pier, Pasir Panjang Ferry Terminal, PSA Marine - West Coast Base, and Sebarok Terminal, according to MPA.
233 1

The Maritime and Port Authority of Singapore (MPA) on Tuesday (29 August) issued a call for proposal (CFP) to develop, commission, maintain, and operate electric harbour craft (e-HC) charging points at Jurong Port, Marina South Pier, Pasir Panjang Ferry Terminal, PSA Marine – West Coast Base, and Sebarok Terminal together with the existing licensees and operators of these sites.

The selected proposals will be implemented as a two-year pilot with an option to extend for another year. MPA will work together with the operators to evaluate the various charging technologies implemented and gather information and feedback on the supporting infrastructure and power requirements. 

The experience gained will contribute towards the development of a charging infrastructure standard for e-HC, the charging infrastructure masterplan, as well as the implementation and operational plans to support e-HC operations in Singapore. MPA plans to progressively roll out the charging infrastructure for e-HC operations in Singapore from 2025.

The CFP follows from an expression of interest launched in July 2023 for proposals to design and promote adoption of full-e-HC in Singapore. The CFP will open from 29 August 2023. 

Interested parties can visit MPA website for more details, and to submit their proposals by 6 October 2023, 1600hrs (Singapore time).

​​Singapore has set a target for the full decarbonisation of harbour craft, pleasurecraft and tugboats by 2050, with the electrification, the use of 100% Biofuel (B100) and other green fuels from 2030 for all new harbour craft.

Manifold Times previously reported MPA issuing an Expression of Interest (EOI) to invite interested parties to submit proposals to design and promote adoption of full-electric harbour craft (e-HC) in Singapore.

Related: Singapore: MPA calls for proposals to design electric harbour craft
Related: Singapore harbourcraft will need to reach net-zero emissions by 2050
Related: MPA factsheet outlines local schemes on reducing carbon emissions

 

Photo credit: Maritime and Port Authority of Singapore
Published: 29 August, 2023