Port of Klaipeda achieves milestone with first STS LNG bunkering operation
- Published
by Admin

The Port of Klaipeda on Thursday (11 April) said it saw its first ship-to-ship LNG bunkering operation on 9 April, marking a significant milestone for maritime services in the major Lithuanian transport hub.
Tanker Avenir Aspiration delivered 326 cubic meters of liquified natural gas (LNG) bunker fuel to a 170-metre length CMA CGM container vessel Containerships Aurora.
Vladas Motiejunas, Harbourmaster, said: “This successful LNG bunkering operation is a milestone for Klaipeda Port and a significant leap forward in diversifying and improving the quality of services port provides to maritime operators.”
“The operation leverages our strategic advantages, including the existing infrastructure of the LNG floating storage and regasification terminal Independence, to offer cleaner, more sustainable bunkering solutions. Klaipeda Port is now firmly on the map as a convenient and reliable location for LNG bunkering in the region.”
CMA CGM operates three LNG-powered vessels in the Baltic Sea, with regular calls at the Port of Klaipeda. There are plans to expand the LNG-powered vessel fleet to six in the near future.
“The possibility to bunker LNG container vessels in the Port of Klaipeda is a strong sign that the port infrastructure is adapting in line with carbon zero targets in shipping. CMA CGM plans to have Klaipeda Port as a regular spot for LNG vessel bunkering”, said Saulius Kazakevicius, General Manager at CMA CGM Lithuania.
Klaipeda Port has the ambition to offer a wider variety of alternative green fuels in the future, including on-site production and bunkering of green hydrogen starting in early 2026.
Klaipeda Port is the major transport hub in Lithuania, serving 6,000 ships per year in the 33 specialised terminals. The port handles containers, ro-ro, LNG, dry bulk, liquid bulk, general, and project cargoes, and half a million passengers per year.
Photo credit: Port of Klaipeda
Published: 12 April 2024