Singapore: MPA offers up to SGD 250,000 in grants for electric harbour craft
- Published
by Admin

The Maritime and Port Authority of Singapore (MPA) on Tuesday (17 November) issued Port Marine Circular No. 12 of 2026 to inform the harbour craft community of the Early Adopter Scheme for Electric Harbour Craft (EASE):
EARLY ADOPTER SCHEME FOR ELECTRIC HARBOUR CRAFT (EASE)
This circular is to inform the harbour craft community of the Early Adopter Scheme for Electric Harbour Craft (EASE), which will be introduced by the Maritime and Port Authority of Singapore (MPA) to accelerate the adoption of electric harbour craft (e-HC). The grant aims to catalyse early market demand and support the development of a competitive e-HC ecosystem.
Transition to Net Zero by 2050
In line with Singapore’s national climate targets, the harbour craft sector is expected to achieve net-zero emissions by 2050. As harbour craft typically remain in service for more than 20 years, fleet renewal decisions over the coming years will be critical to achieving the sector’s net-zero transition. From 2030, all new harbour craft operating in Singapore must be fully electric, capable of using B100 biofuel, or compatible with net-zero fuels.
Early Adopter Scheme for Electric Harbour Craft Grant
Valid for two years, EASE plays a catalytic role by making it manageable for operators to take the first step to trial new technology to build confidence in electrification. This gives early adopters the opportunity to gain operational experience and confidence in using electric harbour craft, while demonstrating the viability of the technology to the rest of the industry. As production volumes increase and technologies mature, the cost of e-HC is expected to decrease over time, improving their commercial viability and supporting an overall smoother and more cost-effective transition for the industry.
Under the grant, operators purchasing eligible e-HC will receive support for the upfront cost of e-HC adoption. The grant quantum will be based on battery capacity and capped according to vessel size, as set out in the table below:


For example, a passenger launch with a battery capacity of 500 kWh will receive a grant of $125,000, while a supply vessel with a battery capacity of 1.2 MWh will receive a grant of $250,000.
Eligibility
To be eligible for the EASE, applicants must be Singapore-incorporated companies and the registered owner of the e-HC as stated on MPA’s harbour craft licence. Under the early adoption grant, fully electric vessels that first obtain their harbour craft licence between 14 October 2026 and 31 December 2028 will be eligible for the grant. The grant is applicable to all harbour craft vessel types operated within Singapore that meet the relevant licensing requirements.
Note: The full version of the notice, including a Frequently Asked Questions (FAQ) section, can be read here.
Related: SIBCON 2026: MPA grant to cover part of battery costs for electric harbour craft
Photo credit: Swapnil Bapat on Unsplash
Published: 17 November, 2026